Project executed from 2019 to 2023
2019
To be updated
2020
Rain Water Harvesting Pits
2021
Gymnasium
Swimming Pool
Fire Safety system (?)
2022
Car Parking (Cellar & Stilt)
Borewell # 2
Boom Barrier
Table Tennis
Water Softener Plant
2023
List to be updated
PROJECTS BY AOHOWA-2024-2026
EXECUTED – IN PROGRESS – IN PLANNING
A. EXECUTED
1. CHILDREN PLAY AREA
i. Swings
ii. Slides
iii. Parallel bars
iv. See Saw
v. Spider Climber
vi. Loop Rings
2. NET GAMES FACILITY FOR
i. Cricket
ii. Throw ball
iii. Basketball practice board
iv. Badminton
v. Tennikoit
3. LIGHTENING ARRESTER
4. FIRE AND SAFETY
i. Completing the semi-finished installations, checking and testing the equipment
ii. Training of the staff and Security & HK personnel
5. BOREWELLS
i. New Borewell drilled & completed near A Block NE side
ii. New Borewell drilled & completed near D Block
iii. Recompleted the Borewell opposite A Block
6. SOLAR POWER PLANTS
i. A BLOCK 13 KVA
ii. B BLOCK 13 KVA
iii. C BLOCK 13 KVA
iv. D BLOCK 20 KVA
v. OTHER COMMON AREAS 40 KVA
7. EARTHING PITS
i. Dug up old pits and filled with new soil, salt and coal
ii. Replaced the old broken earthing funnels with new ones at all four blocks A, B, C & D
8. ELECTRICAL CABLES
i. Replacement of burnt cables of C Block
ii. Rearrangement of sagging electrical cables, tagging and retaining planks at the bottom for all blocks
9. D Block Lift earthing replacement
10. BALUSTERS Replacement
i. Making of Balusters in Campus
ii. Repair of Crowns of
Main gate arch
A Block
B Block
C Block and
D Block
Club House
11. RENOVATION of Swimming pool with major repairs
12. CCTV Phase II implementation covering
i. Blind spots of Phase I implementation at stilt level
ii. Basement car parking area
iii. Each floor of all blocks and terrace
iv. Club house (Gym, Main Hall, Stairs and Admin office)
13. Curtains & Polishing the Club house main hall & front room
14. Expansion Joint Repairs
EJ # 1 repairs between D & C blocks
EJ # 2 repairs between B & C
EJ # 3 repairs between A & B
15. Ducts repairs
i. All four ducts of C Block
ii. Two ducts of B Block
iii. All Four ducts of A Block
16. Spalling concrete repair work in the cellar
17. Repair works on Crowns and borders
18. CIVIL WORKS
i. Repair of entire compound wall
ii. Repairs/Reconstruction of stairs leading to Lift housing on
1. A Block
2. B Block
3. C Block
4. D Block?
ii. Grouting & Water proofing of Club house
iv. Leakages in Cellar in NE Area
1. Gravity drainage by horizontal drilling saving pump-out time of sump water
2. Grouting of North & East side drain to stop leakages
3. Additional drain points using horizontal drilling at stilt level
a. NE corner of A Block
b. Opposite B Block entrance (West side)
c. Opposite (Between) C & D blocks on West side wall
d. Besides Swimming pool (East side wall)
v. New Storeroom construction at B Block stilt level
vi. Repairs of fallen concrete at place which could be reached with the help of long ladders
vii. Re completion of the sump (NE side of A Block cellar area)
viii. Replacement of Sintex tank for WSP
ix. Renovation of washrooms near swimming pool
19. Painting works
i. Compound wall grills
ii. Small gates on either side of Main entrance
iii. D Block staircases (both sides)
iv. Fire and safety water pipes, motors and enclosures
v. Grills around Power meters
vi. Grills enclosures for Solar Plant inverter area
vii. Whitewashing of the patch works carried out
viii. All pipes of play area, ladders, welded equipment
ix. Lift room doors
x. Generator housing frame
20. Welding works
i. To cover all open windows (safety issue)
ii. Folding tables
iii. B block storeroom grills
iv. Ladders
v. Housing for submersible motors in A block sump and main water sumps
21. Barricades for protection of pipes
22. Safety nets installed on terrace of all blocks for protection of cables
23. Periodic Maintenance
i. Overhead tanks cleaning
ii. Septic tank cleaning
iii. Adjacent drain cleaning with JCP
iv. Raw water storage tank cleaning
v. WSP tank cleaning
24. Aqua guard filtered water dispenser
B. PROJECTS IN PROGRESS
a. Civil works: required to stop leakages and preparation for Exterior Painting of the building
i. Treatment of exposed iron of beams and pillars to protect the structure
b. Exterior Painting of the entire campus
i. Compound wall
ii. Main Entrance arch
iii. Crowns
iv. Club house
v. Block A
vi. Block B
vii. Block C
viii. Block D
ix. Stilt Level
x. Cellar Parking area
C. PROJECTS IN PLANNING
1. External lighting to buildings and compound
2. Landscaping by an expert